05.11.2010
In order to avoid the usage of temporary constructive steel frames, Z.has been working on the design of a new supporting system for openings in tunnel linings; it is a high-performance coupling system for tubbings. One model of this new coupling system was built and tested in the laboratory. Its response exceeded the expected peak load by far in the laboratory test.
Numerische_Simulation_Gafaro.pdf
On Friday, 14 August 2026, at 2:00 PM Giao Vu holds her PhD defense, titled 'A Virtual Coda Wave Int
more...
'Measurements of Fiber and Load-rate Effects on Micro- and Macro-fracture of Ultra-High- Performance
more...